Jammu Power Shut down schedule on 07 Nov 2020

Spread the love

Chief Engineer (Distribution) JPDCL, Jammu has informed that for replacement of 11KV VCB panels, the shutdown of 33/11 KV Receiving Station Badyal Brahmana is being observed. During the shutdown, the power supply to Badyal Brahmana and its adjoining areas will remain affected on November 7 from 9 am to 3 pm.

Similarly, for branch cutting and replacement of burnt and damaged hardware, the shutdown of 33KV Canal-Medical Line is being observed. During the shutdown, the power supply to Bakshi Nagar, Rajpura, Gurha, Rehari, Sarwal and adjoining areas will remain affected on November 7 from 8 am to 11 am.

Read more at: https://jkadworld.com/jammu-kashmir-news/jammu-power-shut-down-schedule-on-07-nov-2020/
JKUpdates.in

Leave a Reply

Your email address will not be published. Required fields are marked *

Top